Slag Cement Manufacturing Process

Slag Cement Manufacturing Process
Product Introduction:
Slag Cement Manufacturing process: A process that grinds granulated blast furnace slag with clinker and gypsum to produce slag Portland cement, famous for its sustainability and high resource efficiency. The main steps of production contains:
1. Raw material crushing
2. Raw mill
3. Clinker calcination
4. Cement grinding
5. Finished cement storage and paking
Send Inquiry
Description
Technical Parameters

Slag Cement Manufacturing Process

 

 

slag cement production process
Product Description

Slag cement, also known as blast furnace cement or Portland blast furnace cement (PBFC), is a blended material made by combining Portland cement clinker with 20% to 70% granulated blast furnace slag and a controlled amount of gypsum. This composition enhances durability and sustainability in construction applications.

The slag cement manufacturing process mainly include 4 process steps:
1. Raw material crushing
2. Raw mill
3. Clinker calcination
4. Cement grinding
5. Finished cement storage and packing
These steps ensure slag cement high quality and standard. we also provide cement production machine such as rotary kiln system and grinding system.

 

How To Produce Slag Cement

 

crusher

STEP 1: Raw Material Preparation

The process begins with raw material crushing. Materials such as limestone, slag, and other additives are fed into a cement crusher, where they are crushed or hammered into smaller particles suitable for grinding.

ball mill

STEP 2: Raw Milling

Crushed raw materials are transferred to the raw mill for fine grinding. Vertical roller mills and ball mills are commonly used at this stage. Vertical mills apply hydraulic pressure to grind materials against a rotating table, while ball mills use steel balls to achieve the desired fineness. The resulting raw meal is then sent to a homogenization silo or yard, where materials are blended for consistency before calcination.

rotary kiln

STEP 3: Clinker Production

This stage involves high-temperature processing of the raw meal. The material is first preheated and partially calcined in the preheater system, where it is exposed to hot gases. It then enters the rotary kiln, where, at temperatures around 1450°C, the material undergoes full calcination to form cement clinker. The hot clinker exits the kiln and passes through a grate cooler for rapid cooling and heat recovery before being transported to a clinker storage silo.

ball mill 2

STEP 4: Clinker and Slag Grinding

Stored clinker is mixed with granulated blast furnace slag, gypsum, and other performance-enhancing additives in precise proportions. This mixture is fed into a clinker mill, where it is finely ground into slag cement. Gypsum (up to 5%) or anhydrite is added to control the setting time of the final product.

cement silo

STEP 5: Cement Storage and Packing

The finished slag cement is stored in large silos to maintain product quality. Depending on customer needs, the cement is either dispatched in bulk using tankers or packed into bags using automated packing machines for distribution by road or rail.

 

Company Profile

 

ABOUT AGICO

 

 

AGICO CEMENT serves as a complete solution provider with deep involvement in cement engineering. Founded in the year 2000, the company has effectively executed more than 100 EPC general contracting cement plant projects for clients worldwide, drawing on its extensive technical expertise and substantial project background. Our offerings have reached international markets including Brazil, Russia, Vietnam, Angola, and Mongolia.

 

AGICO is dedicated to offering the worldwide building materials sector comprehensive, end-to-end solutions that span from initial design and equipment provision through to construction and final commissioning.

our clients
our service
iwELAqNqcGcDAgTRBLAF0RgdBrDZ0eabvS3OYgjLa8L-OY8ABwAIAAmuYmxhY2tib2FyZC5waWMKAAsA
quality-certification

 

 

FAQ

Q: How about price?

A: Yes, we are the manufacturer, which allows us to offer you the most competitive prices compared to the market. Our policy is to provide the lowest possible quote to save time and ensure a transparent business approach. Discounts may be offered based on order quantity.

Q: Will you help with installation and staff training?

A: Yes, we can send our engineers to assist with installation and provide staff training if required. However, the buyer is responsible for covering the cost of our technician's round-trip tickets, accommodation, and meals.

Q: What service can we provide?

A: We accept the following delivery terms: FOB, CFR, CIF.
Payment can be made in USD or EUR, using T/T or L/C.
Our team is fluent in English, Chinese, and Italian.

 