Product Description

Start with the Existing Grinding Line
Project Advantages
Why Choose Us?
Interface-Led Engineering
AGICO's review begins with verified tie-in points, equipment elevations, duct routes, foundations, and utility limits.
Feed-Specific Selection
The vertical grinding solution of AGICO CEMENT is sized around moisture, grindability, feed size, abrasiveness, output, and finished-product fineness.
Maintenance Planning
AGICO's layout work considers roller access, lifting space, wear-part handling, inspection routes, and practical shutdown activities.
Coordinated Process Scope
The project team of AGICO CEMENT evaluates the mill together with feeding, hot gas, separation, collection, conveying, and control interfaces.
Working Principle

Grinding, Drying, and Classification
Stable Feeding
Feed enters near the centre of the grinding table and moves outward under centrifugal action. Metering must support a workable material bed.
Material-Bed Grinding
The rollers compress the bed under controlled loading. Feed behaviour and wear duty influence the selected pressure and mechanical arrangement.
Gas Transport and Drying
Process gas lifts suitable particles toward the classifier. When drying is required, gas temperature and volume must match feed moisture and the plant heat balance.
Internal Classification
Material meeting the selected cut leaves with the gas, while coarse particles return for another pass. Separator duty must match the final product target.
Selection Information
Data Needed for a Useful Proposal
Feed analysis and moisture
1
>>
Throughput and fineness target
2
>>
Grindability and abrasiveness
3
>>
Drawings and survey dimensions
4
>>
Gas, filter, and fan conditions
5
>>
Power, control, and service limits
6
Share Your Vertical Mill Project Data
Hot Tags: polysius vertical mill, China polysius vertical mill manufacturers, factory
Technical Parameters
| Reference item | Published value | Project relevance |
| Modular roller arrangement | 2, 4, or 6 rollers | Redundancy and maintenance concept |
| Hot-gas inlets | 2 or 4 | Gas distribution and drying duty |
| Reduced-roller operation | Up to 65% of nominal capacity | Maintenance operating strategy |
| Published large-installation example | More than 600 t/h at 7,000 kW | Market-scale reference only |
The above data is provided for preliminary reference only. Actual plant capacity, mixer configuration, storage volume, power demand, discharge height, control functions, and overall dimensions must be confirmed according to your concrete recipes, site conditions, utilities, operating schedule, and specific project requirements.
FAQ
Is this page for an original Polysius mill?
+
-
It addresses buyers evaluating a vertical-mill project around a Polysius search intent. The final supply scope and manufacturer relationship must be defined in the commercial and technical proposal.
Can AGICO copy an existing mill from a model name alone?
+
-
No. A model designation does not establish feed duty, wear condition, interfaces, foundations, gas balance, or control requirements. A site and process review is required.
Can the existing separator or filter be retained?
+
-
Possibly, but only after checking capacity, pressure drop, product target, gas volume, dust loading, condition, and control compatibility.
What should be sent for a replacement inquiry?
+
-
Send the nameplate and drawings, feed and product data, recent operating records, available site dimensions, utility details, and clear photographs of the mill and connected equipment.
